Selling a Used Gas Turbine: Prepare It Before You List

A gas turbine that is no longer needed is still a valuable asset, but only if a buyer can trust what they are being offered. Most advice on selling a used unit stops at paperwork and valuation. Those matter. What often decides the price, and whether the sale closes at all, is what happens to the machine and the site between the day it stops running and the day it leaves on a truck or a barge.

This post sets out how we would prepare a surplus gas turbine or generator set for sale: the records, the preservation while it waits, and the draining, cleaning and waste work that comes before removal.

Start with one honest description of the unit

Buyers see many listings for the same models. The ones they take seriously are clear and consistent from the first page.

Build the asset schedule

Before anything goes to market, put together a single schedule, matched to serial numbers, that covers:

  1. The engine: model, serial number, package builder and year where it is documented.
  2. The generator, gearbox and auxiliaries: each with its own nameplate data.
  3. Operating history: fired hours and starts, dated, with the last inspection level named, plus fuel and duty profile.
  4. Maintenance records: inspections, borescope reports, repairs and replaced parts.
  5. Package scope: what is included, what is excluded and what is shared with other plant on site.
  6. Location and access: where the unit sits, whether it is installed or skidded, and any limits on lifting and road or sea transport.

If a record is missing, say so. A buyer can price a known gap. A gap they find themselves during inspection tends to cost the seller more than the missing document ever would.

Hours and starts, together

As we explained in our guide to buying a refurbished gas turbine, maintenance on most units is driven by both fired hours and starts, so buyers will ask for both. An hour figure on its own invites questions you would rather answer up front.

Preserve the unit while it waits for a buyer

A sale can take months. In a hot, humid, coastal climate, a turbine that is simply switched off and left will lose value every week it sits.

Shutdown and lay-up

The best time to preserve a unit is when it is taken out of service, not when a buyer turns up. Follow the original equipment manufacturer's (OEM) preservation procedure for the model where you have it, and keep a record of what was done:

  • Engine sealing: inlet and exhaust closed off, and openings blanked.
  • Moisture control: dehumidification or desiccant for the enclosure and the engine, with readings logged.
  • Lube oil and fuel systems: preserved or drained in line with the procedure, with the reasons recorded.
  • Generator: heaters on where power is available, and insulation resistance tested at intervals.
  • Rotor turning: carried out and logged on the schedule the procedure sets.

Keep a storage log

A dated storage log is one of the most persuasive documents a seller can offer. It shows the unit described on the asset schedule is still the unit that will arrive on site. Photos taken on each inspection visit help.

Draining, cleaning and waste: the step most sellers leave too late

Before a turbine package can be dismantled, lifted and shipped, its systems normally have to be drained and its surroundings cleaned. Buyers and transport contractors will usually expect fluids to be removed before the unit moves, and the site owner will want the area left clean once it has gone.

What typically needs attention

  • Lube oil tanks and reservoirs: drained, with residues and sludge removed from the tank bottoms.
  • Fuel systems: liquid fuel lines, day tanks and filters drained and cleaned; gas lines isolated and purged by the site's competent team.
  • Hydraulic and control oil systems: drained and capped.
  • Drains, sumps and bunds: oily water and sediment collected so the plinth and surrounding area can be handed back clean.
  • Filters and consumables: used oil filters, inlet filter elements and absorbents bagged and labelled.

Plan the waste route early

Used oils, oily water, sludge and contaminated filters are waste that has to go to the right facility, with paperwork that follows it. Building this into the sale plan avoids a last-minute scramble when the buyer's transport is already booked. Agree in the sale contract who is responsible for draining, cleaning and coordination of licensed disposal, and who keeps the records.

Enclosed spaces

Some of this work, such as cleaning inside a lube oil reservoir or a fuel day tank, can mean entering a confined space. That needs proper isolation, atmosphere testing, a permit and a trained team, the same as any other tank entry.

Bringing a buyer to inspection

Once the records and the unit are in order, inspection becomes straightforward. A few points help it go smoothly:

  • Release detailed records under a confidentiality agreement to buyers who have shown genuine interest.
  • Have the storage log, photos and asset schedule ready to hand over together.
  • Make access easy: clear the enclosure, arrange lighting and, where it is safe, open the inspection ports a borescope will need.
  • Be clear about title and authority to sell: buyers will ask who owns the unit and who can sign.

What a broker adds

A broker's job is to match the right unit to a buyer with a real need, and to keep one consistent description of the asset in front of every party. In our case, because we also work in tank cleaning, waste management and lay-up, we can help with the preparation work that sits around the sale, not just the introduction.

Frequently asked questions

What documents do I need to sell a used gas turbine?

At minimum: a serial-number schedule for the engine, generator and package, fired hours and starts with the last inspection level, maintenance and borescope records, a scope of supply, and a storage and preservation log. Where a record is missing, say so.

Should I drain the lube oil before selling a gas turbine?

Follow the OEM preservation procedure while the unit is stored. Before it is dismantled and moved, systems are normally drained and cleaned, and the waste sent for coordination of licensed disposal. Agree who does this in the sale contract.

How long does it take to sell a used gas turbine?

It depends on the model, condition, records and market demand, and it can take months. Good preservation during that time protects the price you can ask for.


Planning to sell a surplus turbine or generator set? See our gas turbine brokerage and sourcing page or call +65 9054 0100.

Previous
Previous

Pyrophoric Iron Sulphide: A Tank Cleaning Hazard

Next
Next

Rig Cold Stacking: Clean the Tanks Before You Stack